• About Us
  • Contact Us
SUBSCRIBE
Saturday, October 31, 2026
No Result
View All Result
Green Mile
Advertisement
  • Spotlights
  • Sustainability
  • Waste Management
  • Green Innovations
  • Industries
    • Oil & Gas
    • Re-refinery
    • Maritime
    • Automotive
    • Manufacturing
    • Plantation
  • News
    • News
    • EPR Updates
    • Base Oil Update
  • eMag
  • Spotlights
  • Sustainability
  • Waste Management
  • Green Innovations
  • Industries
    • Oil & Gas
    • Re-refinery
    • Maritime
    • Automotive
    • Manufacturing
    • Plantation
  • News
    • News
    • EPR Updates
    • Base Oil Update
  • eMag
No Result
View All Result
Green Mile
No Result
View All Result
Home News

Batu Arang residents rally against proposed WTE plant, citing health, environmental concerns

Green Mile by Green Mile
25/11/2025
in News
0
Batu Arang residents rally against proposed WTE plant, citing health, environmental concerns
0
SHARES
2
VIEWS
Share on FacebookShare on LinkedinShare to EmailShare to WhatsAppShare to TelegramShare to ChatGPTShare to Pinterest

Batu Arang residents rose up to rally against the proposed building of waste-to-energy (WTE) plant in Batu Arang, Rawang.

According to a report by The Star, more than 500,000 residents living within a 5km radius are expected to be affected if a proposed waste-to-energy (WTE) plant in Batu Arang, Rawang, is built, quoting Jaringan Rawang Tolak Insinerator (JRTI), a residents’ group formed to protest against the project.

The protest was held outside Bangunan Dewan Negeri Selangor, Shah Alam. “Besides those residing in Batu Arang, Bandar Tasik Puteri, Kota Puteri and Bandar Seri Coalfieds, it will also affect those in Kuang and Bandar Country homes,” said JRTI spokesperson Abdul Hanan Abd Mokti.

JRTI previously stated that Batu Arang was situated on a former coal mine, connected by a network of tunnels, while the incinerator plant would be located on a former open-cast coal mine. Their locations could affect the geological stability of the area.

If allowed to proceed, Abdul Hanan said the plant was expected to process waste from six local authorities in Selangor.

He said JRTI learnt that the Environmental Impact Assessment (EIA) report for the proposed RM4.5bil project, also known as the Sultan Idris Shah Green Energy Park, has been rejected by the Environment Department.

Previous Post

Three Perak mining firms suspended for non-compliance

Next Post

PM Anwar To Attend G20 Leaders Summit In South Africa Themed “Solidarity, Equality, Sustainability”

Green Mile

Green Mile

This is abour Green Mile...

Related Posts

Lynas Plans One-Month Shutdown at Malaysian Rare-Earth Refinery for Maintenance
News

Lynas Plans One-Month Shutdown at Malaysian Rare-Earth Refinery for Maintenance

by jeffrey
30/10/2026
SD Guthrie, YTL Power and Bumi Assets Plan 1,623-Acre Industrial Development in Selangor
News

SD Guthrie, YTL Power and Bumi Assets Plan 1,623-Acre Industrial Development in Selangor

by jeffrey
30/10/2026
Dialog Secures Thailand Oil and Gas Concession
News

Dialog’s Upstream Projects and Petroleum Storage Expansion Expected to Drive Growth

by jeffrey
30/10/2026
Malaysia’s Haze Crisis Estimated to Cause RM 8 Billion in Welfare Losses
News

Malaysia’s Haze Crisis Estimated to Cause RM 8 Billion in Welfare Losses

by jeffrey
29/10/2026
Malaysian Shopping Malls Prepare for Expanded Recycling Requirements
News

Malaysian Shopping Malls Prepare for Expanded Recycling Requirements

by jeffrey
29/10/2026
Next Post
PM Anwar To Attend G20 Leaders Summit In South Africa Themed “Solidarity, Equality, Sustainability”

PM Anwar To Attend G20 Leaders Summit In South Africa Themed “Solidarity, Equality, Sustainability”

Premium Content

Global Renewable Energy Expansion Expected to Slow for the First Time in Five Years

Global Renewable Energy Expansion Expected to Slow for the First Time in Five Years

28/10/2026
Soy trading firms to abandon Amazon protection pact in Brazil

Major Brazilian grain traders quit Amazon conservation pact

14/01/2026
US Solar module, cell imports drop in Q3 amid policy shifts, price increases

US Solar module, cell imports drop in Q3 amid policy shifts, price increases

18/12/2025

Browse by Category

  • Automotive
  • Green Innovations
  • Maritime
  • News
  • Oil & Gas
  • Plantation
  • Re-refinery
  • Spotlights
  • Sustainability
  • Waste Management
Green Mile

Green Mile (GM) is a leading online magazine dedicated to fostering sustainable waste management practices, sustainability and the circular economy.

Categories

  • Automotive
  • Green Innovations
  • Maritime
  • News
  • Oil & Gas
  • Plantation
  • Re-refinery
  • Spotlights
  • Sustainability
  • Waste Management

Recent Posts

  • Lynas Plans One-Month Shutdown at Malaysian Rare-Earth Refinery for Maintenance
  • SD Guthrie, YTL Power and Bumi Assets Plan 1,623-Acre Industrial Development in Selangor
  • Dialog’s Upstream Projects and Petroleum Storage Expansion Expected to Drive Growth

Contact Us

HQ address:
Level 23A, EXSIM Tower @ Millerz Square,
Jalan Klang Lama, 58000 Kuala Lumpur.
Office no: ‪+603-8080 1000‬

Gunaprasth Bupalan, Editor-In-Chief
Guna@greenmile.com.my
Contact no: ‪+6017-920 3544‬

Jeffrey Chiak- Head of Marketing
jeffrey@greenmile.com.my
H/P no: 6012-358 7296

© 2025 Green Mile Communications Sdn. Bhd. 202501049682 (1651090-M) | Developed by CL Online Marketing Agency

No Result
View All Result
  • Home
  • Sustainability
  • Waste Management
  • Green Innovations
  • Oil & Gas
  • Re-refinery
  • Plantation
  • Maritime
  • Automotive
  • Manufacturing
  • EPR Updates

© 2025 Green Mile Communications Sdn. Bhd. 202501049682 (1651090-M) | Developed by CL Online Marketing Agency